Harvey Economics (Firm)
Author
Formats
Summary
"This report summarizes the findings of the feasibility or re-timing the release of water from the flood pool from 12 scenarios, assesses the potential environmental and recreation impacts from the re-timing the release of the water, estimates the economic costs and benefits, and summarizes potential modifications required to the U.S. Army Corps of Engineers' (USACE) Water Control Mnaual for Glendo Reservoir." -- pg. ES-1.